BUILDER APPOINTED
CONSTRUCTION IS NOW UNDERWAY

Progress Update

Published On: 07 May 19


The Botanic structural slab level is now at Level 6 and the lift core structure has reached Level 9.

In mid April, Level 5 slab pour was completed. This is of significance as Level 5 has a cantilever (slab projection) over the neighbouring building which Botanic Melbourne has the air rights to.

Glazing systems (aluminium frames with high performance glass) have been installed on Level 2.

 

 

 